§ 117.955. Buffalo Bayou.
39 words·~1 min read·
/us/cfr/t33/s§ 117.955·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the Houston Belt and Terminal railroad bridge, mile 1.2 at Houston, and all drawbridges downstream of it, shall open on signal if at least 24 hours' notice if given. \[USCG-2025-1113, 91 FR 3036, Jan. 26, 2026\]
Connections4 cite this
Cited by 4 sections · top 1
register
Citation graph
cites case law
§ 117.955
Buffalo Bayou.
Fed. Reg.×4
Cites 0Cited by 4 across 1 source